From Legacy Industrial Sites to Data-Ready Ground: Preparing the Midwest for Data Center Development

  • Writer: Sarah Powers
    Sarah Powers
  • Feb 3
  • 4 min read

Across the Midwest, the next generation of data center development is increasingly being built on land with a past.


A site in Ohio getting prepared for a future Data Center development.
A site in Ohio getting prepared for a future Data Center development.

Shuttered industrial plants, former utility properties, and long-idle manufacturing facilities are emerging as some of the most attractive locations for large-scale data infrastructure. These sites offer proximity to power, transmission corridors, transportation networks, and industrial zoning—advantages that greenfield sites often can’t match.


But transforming a legacy industrial property into a data-ready site isn’t simple. It requires experience, coordination, and the ability to manage risk well before construction begins.

That’s where the right redevelopment partner makes all the difference.


Why Legacy Industrial Sites Are Ideal for Data Centers


  • Power and Infrastructure Are Already in Place

    Many former industrial and utility-owned properties sit adjacent to substations, transmission lines, and existing infrastructure—critical requirements for data center development.


  • Speed to Market

    Redeveloping previously zoned industrial land can significantly reduce entitlement timelines compared to new greenfield development.


  • Municipal Support for Redevelopment

    Communities across Michigan, Ohio, and Indiana are eager to see idle properties redeveloped into long-term, tax-generating assets; especially projects that bring investment without heavy public impact.

 

The Real Challenge: It’s Not Just Clearing the Site

For data center developers, demolition is only one piece of the puzzle.


The real challenges typically include:

  • Environmental contamination and long-term liability

  • Complex permitting and regulatory oversight

  • Community and stakeholder concerns

  • Coordination with utilities and public agencies

  • Eligibility for tax incentives, grants, and redevelopment funds

  • Tight timelines tied to capital deployment


Projects often stall not because the site can’t be cleared, but because the risks aren’t managed.


Data Center Development Requires a Different Kind of Partner

Successful data center redevelopment starts long before construction fencing goes up.

Melching works with data center developers at the front end of the process, helping evaluate sites, reduce uncertainty, and create a clear path to shovel-ready land.


This includes:

  • Early site evaluation and feasibility analysis

  • Environmental risk identification and remediation planning

  • Demolition, decommissioning, and material handling

  • Full site preparation and grading

  • Regulatory coordination across multiple jurisdictions

 

Proven Experience at Scale

In 2025, Melching completed preparation of a 1.4-million-square-foot shuttered industrial plant in Ohio, converting the site into a shovel-ready property for a data center developer.


The project required:

  • Large-scale structural demolition

  • Environmental remediation and compliance management

  • Coordination with state and local regulatory agencies

  • Site preparation aligned with data center development requirements


The result was shovel-ready site delivered on schedule, demonstrating both the scale of work Melching can handle and the level of precision data center projects demand.


Navigating Regulations Across State Lines

Data center development in the Midwest is rarely confined to one regulatory framework.

Each state, and often each municipality, has distinct environmental standards, permitting processes, and redevelopment requirements. Managing those differences is critical to keeping projects on track.


Melching brings hands-on experience navigating:


  • State environmental regulations throughout the Midwest

  • Brownfield redevelopment programs and incentive structures

  • Local permitting, inspections, and reporting requirements

  • Agency coordination and compliance documentation


By addressing regulatory requirements early and proactively, Melching helps developers avoid delays, rework, and compliance-driven cost overruns.

 

Unlocking Sites Others Won’t Touch

In many cases, the biggest barrier to redevelopment isn’t construction, it’s liability.

Legacy industrial and utility-owned sites often carry environmental, regulatory, or ownership challenges that make developers hesitant to move forward. Melching’s experience allows us to help bridge that gap.


In select situations, Melching may acquire properties directly from utilities, industrial owners, or public entities—and, when appropriate, assume responsibility for managing site conditions and environmental liability as part of the redevelopment process.


This approach can:

  • Reduce upfront risk for developers

  • Simplify complex ownership or liability structures

  • Accelerate timelines by resolving issues before development begins


It’s not the right solution for every project, but when used strategically, it can unlock sites that would otherwise remain dormant.

 

More Than Demolition: Aligning Stakeholders Early

Successful data center redevelopment requires alignment beyond the property line.

Melching frequently works alongside:


  • Local elected officials and planning authorities to align redevelopment goals with community priorities

  • Environmental regulators and stakeholder groups to ensure transparency and compliance

  • Developers and advisors navigating tax incentives, brownfield funding, and redevelopment grants


These early conversations often determine whether a project moves forward smoothly, or stalls before it ever breaks ground.

 

What “Shovel-Ready” Really Means for Data Centers

For data center developers, shovel-ready isn’t just cleared land.


It means:

  • Environmental liability addressed and documented

  • Regulatory requirements satisfied

  • Site grading and preparation complete

  • Infrastructure considerations accounted for

  • No surprises once construction begins


Melching’s integrated, full-scope approach ensures that when a site is delivered, it’s truly ready for what comes next.

 

Building the Midwest’s Data Infrastructure—The Right Way


As demand for data storage, cloud infrastructure, and digital services continues to grow, the Midwest is becoming a critical hub for data center development.


The success of these projects depends on partners who understand not just demolition—but land, liability, regulation, and long-term value.


Melching has spent decades turning complex, high-risk industrial sites into opportunities. Today, that experience is helping power the next generation of data infrastructure across Michigan, Ohio, and Indiana.

 

Ready to Evaluate a Data Center Site? Let’s Talk Early.


If you’re considering a legacy industrial or utility-owned property for data center development, the right conversation at the right time can save months—and millions.

Melching will help assess feasibility, manage risk, and deliver a site that’s ready to build.


Melching makes way for progress—one site, one challenge, one clean slate at a time.

 
 
 